Leaves on the Line

Beaconsfield

BCF Central route
CSV JSON

0 delay minutes

No delay was picked up at Beaconsfield in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver32
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)18
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)17
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)16
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)15
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)14
J3Axle Counter Failure13
MDTechnical failures below the solebar10
ICTrack circuit failure (including no fault found)7
OCSignaller including mis-routing (not ERTM /ETCS related)7