Bicester North
282 delay minutes
The biggest share (25%) of the delay picked up at Bicester North in the four weeks to 9 December 2023 came from faulty trains.
40% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 2% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 29 | 10% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 18 | 6% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 30 | 11% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 56 | 20% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 70 | 25% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Traincrew | 16 | 6% | 11% | 1 a day, the least in 5 years | 1 |
| Stations | 21 | 7% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 2 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 36 | 13% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 30 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 21 |
| M7 | Door and Door system faults | 18 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 18 |
| MD | Technical failures below the solebar | 17 |
| IB | Points failure (including no fault found) | 15 |
| RB | Passengers joining/alighting | 15 |
| Q3 | NZ Pumps T | 14 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 13 |
| TT | Leaf fall Neutral | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,026 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,626 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 2,605 |
| MD | Technical failures below the solebar | 2,603 |
| TG | Driver | 2,566 |
| IC | Track circuit failure (including no fault found) | 2,468 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,439 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,793 |
| J3 | Axle Counter Failure | 1,447 |
| IB | Points failure (including no fault found) | 1,058 |