CSV JSON

282 delay minutes

The biggest share (25%) of the delay picked up at Bicester North in the four weeks to 9 December 2023 came from faulty trains.

40% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track52%8% 0 a day, the least in 5 years-
Signals, points and power2910%16% 1 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn186%7% 1 a day, more than 1 of the other 4 years-
External3011%4% 1 a day, more than 3 of the other 4 years-
Network management5620%17% 2 a day, the least in 5 years-
The operators' causes
Train faults7025%16% 3 a day, more than 2 of the other 4 years-
Traincrew166%11% 1 a day, the least in 5 years1
Stations217%3% 1 a day, more than 2 of the other 4 years-
Operations2<1%5% 0 a day, the least in 5 years-
Operator, other3613%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XPBRIDGE HIT30
I8Animal Strike or Incursion within the control of Network Rail21
M7Door and Door system faults18
MNBrake and brake systems faults; including wheel flats where no other cause had been identified18
MDTechnical failures below the solebar17
IBPoints failure (including no fault found)15
RBPassengers joining/alighting15
Q3NZ Pumps T14
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps13
TTLeaf fall Neutral13
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,026
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,626
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure2,605
MDTechnical failures below the solebar2,603
TGDriver2,566
ICTrack circuit failure (including no fault found)2,468
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,439
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,793
J3Axle Counter Failure1,447
IBPoints failure (including no fault found)1,058