Leaves on the Line

Brockenhurst

BCU Wessex route
CSV JSON

2,839 delay minutes

The biggest share (30%) of the delay picked up at Brockenhurst in the four weeks to 9 December 2023 came from track faults.

57% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track84430%8% 30 a day, more than 3 of the other 4 years22
Signals, points and power34312%16% 12 a day, more than 2 of the other 4 years3
Weather and structures933%7% 3 a day, more than 1 of the other 4 years1
Autumn30211%7% 11 a day, the most in 5 years-
External753%4% 3 a day, more than 1 of the other 4 years2
Network management32712%17% 12 a day, more than 1 of the other 4 years2
The operators' causes
Train faults32311%16% 12 a day, more than 2 of the other 4 years7
Traincrew1485%11% 5 a day, more than 3 of the other 4 years2
Stations612%3% 2 a day, more than 2 of the other 4 years-
Operations522%5% 2 a day, the most in 5 years23
Operator, other27210%7% 10 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.808
Q3NZ Pumps T207
TTLeaf fall Neutral207
MDTechnical failures below the solebar171
IBPoints failure (including no fault found)167
TGDriver104
M7Door and Door system faults52
JKFlooding not due to exceptional weather51
QBPlanned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules)46
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident45
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.29,499
ICTrack circuit failure (including no fault found)14,034
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)8,611
IRBroken/cracked/twisted/buckled/flawed rail7,244
MDTechnical failures below the solebar4,443
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,897
TGDriver3,466
T2Delay at unstaffed station to non-DOO train3,377
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,541
IBPoints failure (including no fault found)2,457