Brundall
252 delay minutes
The biggest share (37%) of the delay picked up at Brundall in the four weeks to 9 December 2023 came from weather and structures.
49% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 29 | 12% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 92 | 37% | 7% | 3 a day, the most in 5 years | - |
| Autumn | 50 | 20% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 8 | 3% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 12 | 5% | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 26 | 10% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 22 | 9% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 14 | 5% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 92 |
| QJ | Special working for leaf-fall track circuit operation | 22 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 11 |
| MU | Depot operating problem | 11 |
| QI | Cautioning due to railhead leaf contamination | 11 |
| Q3 | NZ Pumps T | 10 |
| TT | Leaf fall Neutral | 10 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 8 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 8 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 5,666 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,836 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,256 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,117 |
| MU | Depot operating problem | 756 |
| IK | Telecom equipment failure (including no fault found) | 719 |
| J3 | Axle Counter Failure | 706 |
| MD | Technical failures below the solebar | 672 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 427 |
| Q1 | Takeback Pumps | 397 |