Bedford
1,851 delay minutes
The biggest share (27%) of the delay picked up at Bedford in the four weeks to 9 December 2023 came from traincrew problems.
60% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 147 | 8% | 8% | 5 a day, more than 2 of the other 4 years | 1 |
| Signals, points and power | 306 | 17% | 16% | 11 a day, the least in 5 years | 6 |
| Weather and structures | 113 | 6% | 7% | 4 a day, more than 3 of the other 4 years | 6 |
| Autumn | 62 | 3% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 59 | 3% | 4% | 2 a day, more than 1 of the other 4 years | - |
| Network management | 392 | 21% | 17% | 14 a day, more than 2 of the other 4 years | 43 |
| The operators' causes | |||||
| Train faults | 117 | 6% | 16% | 4 a day, the least in 5 years | 12 |
| Traincrew | 494 | 27% | 11% | 18 a day, the most in 5 years | 65 |
| Stations | 9 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 72 | 4% | 5% | 3 a day, the least in 5 years | 10 |
| Operator, other | 81 | 4% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 364 |
| TI | Traincrew rostering problem | 108 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 98 |
| IB | Points failure (including no fault found) | 94 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 90 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 66 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 62 |
| J3 | Axle Counter Failure | 58 |
| XB | Vandalism or theft (including the placing of objects on the line) | 40 |
| Q3 | NZ Pumps T | 38 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 16,583 |
| M8 | Technical failures above the Solebar | 9,135 |
| TI | Traincrew rostering problem | 5,684 |
| IC | Track circuit failure (including no fault found) | 5,335 |
| MD | Technical failures below the solebar | 4,774 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,730 |
| IB | Points failure (including no fault found) | 4,175 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,651 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 3,308 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,068 |