Brading
147 delay minutes
Most of the delay picked up at Brading in the four weeks to 9 December 2023 came from other operator causes.
44% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 21 | 14% | 16% | - |
| Traincrew | 6 | 4% | 11% | - |
| Stations | 25 | 17% | 3% | - |
| Operations | 21 | 14% | 5% | - |
| Operator, other | 74 | 50% | 7% | 2 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 67 |
| MD | Technical failures below the solebar | 21 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 16 |
| RP | Passenger dropped object whilst boarding/alighting from train and train delayed at TOC request | 11 |
| T2 | Delay at unstaffed station to non-DOO train | 9 |
| JK | Flooding not due to exceptional weather | 7 |
| TG | Driver | 6 |
| R8 | Delay at Station believed to be operator cause and information required from operator (Ops Responsibility) | 5 |
| T8 | Delays at Station believed to be operator cause and Information required from operator (Ops responsibility) | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 801 |
| TZ | Other Passenger Train Operating Company causes | 328 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 305 |
| TG | Driver | 222 |
| IA | Signal failure (including no fault found) | 205 |
| MD | Technical failures below the solebar | 197 |
| R8 | Delay at Station believed to be operator cause and information required from operator (Ops Responsibility) | 121 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 114 |
| XB | Vandalism or theft (including the placing of objects on the line) | 93 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 86 |