2,103 delay minutes

The biggest share (16%) of the delay picked up at Bridlington in the four weeks to 9 December 2023 came from signal, points and power faults.

60% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1698%8% 6 a day, more than 3 of the other 4 years-
Signals, points and power33316%16% 12 a day, more than 3 of the other 4 years-
Weather and structures693%7% 2 a day, more than 3 of the other 4 years-
Autumn28213%7% 10 a day, more than 2 of the other 4 years1
External653%4% 2 a day, the most in 5 years-
Network management31015%17% 11 a day, the most in 5 years1
The operators' causes
Train faults30615%16% 11 a day, the most in 5 years9
Traincrew1879%11% 7 a day, the most in 5 years18
Stations1588%3% 6 a day, the most in 5 years-
Operations733%5% 3 a day, the most in 5 years-
Operator, other1527%7% 5 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar189
OUDelays not Investigated by Network Rail166
TGDriver162
Q3NZ Pumps T152
TTLeaf fall Neutral150
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles140
JSCondition of Track TSR outside the Timetable Planning Rules125
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed76
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure65
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)60
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar3,539
JSCondition of Track TSR outside the Timetable Planning Rules3,459
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,906
ICTrack circuit failure (including no fault found)2,610
Q3NZ Pumps T2,456
RCre-booked assistance for a person with reduced mobility joining/alighting,2,136
TTLeaf fall Neutral2,030
RBPassengers joining/alighting1,857
TGDriver1,824
OUDelays not Investigated by Network Rail1,569