Bedwyn
1,695 delay minutes
The biggest share (19%) of the delay picked up at Bedwyn in the four weeks to 9 December 2023 came from faulty trains.
67% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 255 | 15% | 8% | 9 a day, the most in 5 years | 1 |
| Signals, points and power | 178 | 11% | 16% | 6 a day, the least in 5 years | 4 |
| Weather and structures | 53 | 3% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 123 | 7% | 7% | 4 a day, more than 3 of the other 4 years | - |
| External | 97 | 6% | 4% | 3 a day, more than 3 of the other 4 years | 1 |
| Network management | 249 | 15% | 17% | 9 a day, the most in 5 years | 10 |
| The operators' causes | |||||
| Train faults | 318 | 19% | 16% | 11 a day, more than 1 of the other 4 years | 4 |
| Traincrew | 228 | 13% | 11% | 8 a day, the most in 5 years | 5 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 35 | 2% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 160 | 9% | 7% | 6 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 225 |
| MC | Diesel Loco failure, defect, attention | 175 |
| Q3 | NZ Pumps T | 123 |
| TT | Leaf fall Neutral | 123 |
| OU | Delays not Investigated by Network Rail | 122 |
| IB | Points failure (including no fault found) | 111 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 106 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 88 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 80 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 57 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,267 |
| IC | Track circuit failure (including no fault found) | 4,152 |
| MD | Technical failures below the solebar | 3,597 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,347 |
| ZU | No Cause Identified After investigation by both Parties | 2,931 |
| IA | Signal failure (including no fault found) | 2,817 |
| IB | Points failure (including no fault found) | 2,718 |
| J3 | Axle Counter Failure | 2,654 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 2,487 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 2,458 |