Leaves on the Line

Bedwyn

BDW Western route
CSV JSON

1,695 delay minutes

The biggest share (19%) of the delay picked up at Bedwyn in the four weeks to 9 December 2023 came from faulty trains.

67% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track25515%8% 9 a day, the most in 5 years1
Signals, points and power17811%16% 6 a day, the least in 5 years4
Weather and structures533%7% 2 a day, the most in 5 years-
Autumn1237%7% 4 a day, more than 3 of the other 4 years-
External976%4% 3 a day, more than 3 of the other 4 years1
Network management24915%17% 9 a day, the most in 5 years10
The operators' causes
Train faults31819%16% 11 a day, more than 1 of the other 4 years4
Traincrew22813%11% 8 a day, the most in 5 years5
Stations--3% 0 a day, the least in 5 years-
Operations352%5% 1 a day, more than 2 of the other 4 years-
Operator, other1609%7% 6 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver225
MCDiesel Loco failure, defect, attention175
Q3NZ Pumps T123
TTLeaf fall Neutral123
OUDelays not Investigated by Network Rail122
IBPoints failure (including no fault found)111
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.106
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)88
IRBroken/cracked/twisted/buckled/flawed rail80
JSCondition of Track TSR outside the Timetable Planning Rules57
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,267
ICTrack circuit failure (including no fault found)4,152
MDTechnical failures below the solebar3,597
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,347
ZUNo Cause Identified After investigation by both Parties2,931
IASignal failure (including no fault found)2,817
IBPoints failure (including no fault found)2,718
J3Axle Counter Failure2,654
JHCritical Rail Temperature speeds, (other than buckled rails)2,487
JSCondition of Track TSR outside the Timetable Planning Rules2,458