Beverley

BEV North & East route
CSV JSON

1,070 delay minutes

The biggest share (18%) of the delay picked up at Beverley in the four weeks to 9 December 2023 came from how the network was run.

51% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track252%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power18617%16% 7 a day, the most in 5 years-
Weather and structures474%7% 2 a day, more than 3 of the other 4 years-
Autumn18017%7% 6 a day, more than 3 of the other 4 years-
External373%4% 1 a day, the most in 5 years-
Network management19318%17% 7 a day, more than 3 of the other 4 years7
The operators' causes
Train faults929%16% 3 a day, more than 2 of the other 4 years1
Traincrew11911%11% 4 a day, the most in 5 years1
Stations676%3% 2 a day, the most in 5 years-
Operations424%5% 2 a day, more than 3 of the other 4 years-
Operator, other828%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail111
QJSpecial working for leaf-fall track circuit operation96
TGDriver85
Q3NZ Pumps T75
TTLeaf fall Neutral69
MNBrake and brake systems faults; including wheel flats where no other cause had been identified57
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail47
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles45
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure37
ICTrack circuit failure (including no fault found)36
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,665
MDTechnical failures below the solebar1,974
TGDriver1,558
RCre-booked assistance for a person with reduced mobility joining/alighting,1,193
ICTrack circuit failure (including no fault found)1,174
OCSignaller including mis-routing (not ERTM /ETCS related)1,126
OUDelays not Investigated by Network Rail911
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure909
M7Door and Door system faults801
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)797