Leaves on the Line

Brentford

BFD Wessex route
CSV JSON

409 delay minutes

The biggest share (29%) of the delay picked up at Brentford in the four weeks to 9 December 2023 came from other operator causes.

38% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track92%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power246%16% 1 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn4611%7% 2 a day, more than 3 of the other 4 years-
External3<1%4% 0 a day, the least in 5 years-
Network management7619%17% 3 a day, the least in 5 years-
The operators' causes
Train faults133%16% 0 a day, the least in 5 years-
Traincrew379%11% 1 a day, more than 2 of the other 4 years-
Stations7518%3% 3 a day, the most in 5 years-
Operations72%5% 0 a day, the most in 5 years-
Operator, other11929%7% 4 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
VHPassenger Communication cord, door egress or emergency train alarm operated75
T2Delay at unstaffed station to non-DOO train57
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)49
Q3NZ Pumps T38
TTLeaf fall Neutral38
TGDriver18
I4OHLE/third rail power supply failure or reduction12
OCSignaller including mis-routing (not ERTM /ETCS related)10
TH(Senior) Conductor/Train Manager10
RYMishap - Station Operating causes9
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,888
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)4,164
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,249
T2Delay at unstaffed station to non-DOO train2,571
ICTrack circuit failure (including no fault found)2,092
VHPassenger Communication cord, door egress or emergency train alarm operated1,521
TGDriver1,064
I4OHLE/third rail power supply failure or reduction1,021
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure901
OCSignaller including mis-routing (not ERTM /ETCS related)687