Brentford
409 delay minutes
The biggest share (29%) of the delay picked up at Brentford in the four weeks to 9 December 2023 came from other operator causes.
38% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 2% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 24 | 6% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 46 | 11% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 76 | 19% | 17% | 3 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 13 | 3% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 37 | 9% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 75 | 18% | 3% | 3 a day, the most in 5 years | - |
| Operations | 7 | 2% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | 119 | 29% | 7% | 4 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 75 |
| T2 | Delay at unstaffed station to non-DOO train | 57 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 49 |
| Q3 | NZ Pumps T | 38 |
| TT | Leaf fall Neutral | 38 |
| TG | Driver | 18 |
| I4 | OHLE/third rail power supply failure or reduction | 12 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 10 |
| TH | (Senior) Conductor/Train Manager | 10 |
| RY | Mishap - Station Operating causes | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,888 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 4,164 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,249 |
| T2 | Delay at unstaffed station to non-DOO train | 2,571 |
| IC | Track circuit failure (including no fault found) | 2,092 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,521 |
| TG | Driver | 1,064 |
| I4 | OHLE/third rail power supply failure or reduction | 1,021 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 901 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 687 |