Leaves on the Line

London Blackfriars

BFR Kent route
CSV JSON

1,762 delay minutes

The biggest share (30%) of the delay picked up at London Blackfriars in the four weeks to 9 December 2023 came from signal, points and power faults.

57% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track11<1%8% 0 a day, the least in 5 years-
Signals, points and power52830%16% 19 a day, the most in 5 years-
Weather and structures734%7% 3 a day, the most in 5 years-
Autumn16<1%7% 1 a day, more than 2 of the other 4 years-
External302%4% 1 a day, more than 2 of the other 4 years-
Network management30717%17% 11 a day, more than 3 of the other 4 years10
The operators' causes
Train faults20211%16% 7 a day, the most in 5 years8
Traincrew44925%11% 16 a day, the most in 5 years35
Stations483%3% 2 a day, the most in 5 years-
Operations17<1%5% 1 a day, more than 1 of the other 4 years2
Operator, other825%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver392
ICTrack circuit failure (including no fault found)256
J3Axle Counter Failure132
M8Technical failures above the Solebar95
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)78
OCSignaller including mis-routing (not ERTM /ETCS related)71
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)70
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)63
I1Overhead line/third rail defect61
M7Door and Door system faults59
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver13,941
ICTrack circuit failure (including no fault found)8,523
M8Technical failures above the Solebar8,296
TITraincrew rostering problem4,163
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,940
IRBroken/cracked/twisted/buckled/flawed rail3,671
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,492
IBPoints failure (including no fault found)3,385
VHPassenger Communication cord, door egress or emergency train alarm operated2,778
I1Overhead line/third rail defect2,489