Brighouse
18 delay minutes
The biggest share (39%) of the delay picked up at Brighouse in the four weeks to 9 December 2023 came from how the network was run.
100% of these minutes were knock-on from something that happened elsewhere first. 67% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 6 | 33% | 7% | - |
| External | - | - | 4% | - |
| Network management | 7 | 39% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 2 | 11% | 11% | 3 |
| Stations | - | - | 3% | - |
| Operations | 3 | 17% | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 6 |
| OA | Regulation Decision Made With Best Endeavours | 4 |
| FH | FOC Planning issue (not diagramming or rostering) | 3 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3 |
| TG | Driver | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 263 |
| MD | Technical failures below the solebar | 159 |
| TH | (Senior) Conductor/Train Manager | 140 |
| MU | Depot operating problem | 137 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 125 |
| QM | Train schedule/STP Process including erroneous simplifiers | 107 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 106 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 85 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 71 |
| IZ | Other Infrastructure causes | 68 |