440 delay minutes

The biggest share (47%) of the delay picked up at Bellingham in the four weeks to 9 December 2023 came from how the network was run.

83% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4<1%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power4310%16% 2 a day, the least in 5 years-
Weather and structures113%7% 0 a day, more than 3 of the other 4 years-
Autumn389%7% 1 a day, more than 1 of the other 4 years-
External3<1%4% 0 a day, the least in 5 years-
Network management20847%17% 7 a day, the most in 5 years-
The operators' causes
Train faults143%16% 1 a day, more than 1 of the other 4 years1
Traincrew286%11% 1 a day, more than 2 of the other 4 years-
Stations194%3% 1 a day, more than 3 of the other 4 years-
Operations3<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other7016%7% 2 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)159
Q3NZ Pumps T38
TTLeaf fall Neutral36
VHPassenger Communication cord, door egress or emergency train alarm operated32
TGDriver28
ICTrack circuit failure (including no fault found)16
I6Delays as a result of line blocks / track patrols (including late handback)15
OCSignaller including mis-routing (not ERTM /ETCS related)14
IBPoints failure (including no fault found)9
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)8
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,092
TGDriver1,782
VHPassenger Communication cord, door egress or emergency train alarm operated1,743
ICTrack circuit failure (including no fault found)1,307
IBPoints failure (including no fault found)1,194
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.754
M8Technical failures above the Solebar724
TTLeaf fall Neutral704
XPBRIDGE HIT667
OCSignaller including mis-routing (not ERTM /ETCS related)638