Leaves on the Line

Birmingham International

BHI Central route
CSV JSON

5,001 delay minutes

The biggest share (17%) of the delay picked up at Birmingham International in the four weeks to 9 December 2023 came from signal, points and power faults.

79% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1794%8% 6 a day, more than 1 of the other 4 years1
Signals, points and power85717%16% 31 a day, more than 3 of the other 4 years-
Weather and structures1463%7% 5 a day, the least in 5 years1
Autumn3256%7% 12 a day, the most in 5 years-
External2776%4% 10 a day, the most in 5 years-
Network management83217%17% 30 a day, more than 2 of the other 4 years7
The operators' causes
Train faults78216%16% 28 a day, more than 3 of the other 4 years3
Traincrew58712%11% 21 a day, more than 1 of the other 4 years4
Stations3056%3% 11 a day, more than 2 of the other 4 years-
Operations1653%5% 6 a day, more than 3 of the other 4 years-
Operator, other54711%7% 20 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver428
IBPoints failure (including no fault found)406
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards271
VHPassenger Communication cord, door egress or emergency train alarm operated199
Q3NZ Pumps T191
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)146
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.142
MDTechnical failures below the solebar139
MPRail / wheel interface, adhesion problems (including ice on the running rail)137
XPBRIDGE HIT131
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver22,316
ZUNo Cause Identified After investigation by both Parties11,735
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)11,419
TH(Senior) Conductor/Train Manager10,148
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,339
IBPoints failure (including no fault found)8,952
M8Technical failures above the Solebar7,717
J3Axle Counter Failure7,424
MDTechnical failures below the solebar7,349
IRBroken/cracked/twisted/buckled/flawed rail6,878