Birmingham New Street
19,469 delay minutes
The biggest share (18%) of the delay picked up at Birmingham New Street in the four weeks to 9 December 2023 came from faulty trains.
68% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2,795 | 14% | 8% | 100 a day, the most in 5 years | 21 |
| Signals, points and power | 2,868 | 15% | 16% | 102 a day, more than 1 of the other 4 years | 55 |
| Weather and structures | 548 | 3% | 7% | 20 a day, more than 1 of the other 4 years | 8 |
| Autumn | 657 | 3% | 7% | 23 a day, more than 3 of the other 4 years | 7 |
| External | 805 | 4% | 4% | 29 a day, more than 3 of the other 4 years | 17 |
| Network management | 2,777 | 14% | 17% | 99 a day, more than 2 of the other 4 years | 245 |
| The operators' causes | |||||
| Train faults | 3,531 | 18% | 16% | 126 a day, more than 2 of the other 4 years | 82 |
| Traincrew | 3,492 | 18% | 11% | 125 a day, more than 3 of the other 4 years | 320 |
| Stations | 730 | 4% | 3% | 26 a day, more than 2 of the other 4 years | 2 |
| Operations | 461 | 2% | 5% | 16 a day, more than 2 of the other 4 years | 11 |
| Operator, other | 807 | 4% | 7% | 29 a day, the least in 5 years | 5 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,634 |
| TG | Driver | 2,618 |
| IB | Points failure (including no fault found) | 1,192 |
| J8 | OTM DAMAGE | 741 |
| MD | Technical failures below the solebar | 678 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 646 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 619 |
| TH | (Senior) Conductor/Train Manager | 569 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 556 |
| M8 | Technical failures above the Solebar | 447 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 95,836 |
| TH | (Senior) Conductor/Train Manager | 41,408 |
| MD | Technical failures below the solebar | 37,697 |
| IB | Points failure (including no fault found) | 35,699 |
| M8 | Technical failures above the Solebar | 32,247 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 28,664 |
| I1 | Overhead line/third rail defect | 24,882 |
| J3 | Axle Counter Failure | 20,618 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 20,536 |
| IC | Track circuit failure (including no fault found) | 19,675 |