Leaves on the Line

Birmingham New Street

BHM Central route
CSV JSON

19,469 delay minutes

The biggest share (18%) of the delay picked up at Birmingham New Street in the four weeks to 9 December 2023 came from faulty trains.

68% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2,79514%8% 100 a day, the most in 5 years21
Signals, points and power2,86815%16% 102 a day, more than 1 of the other 4 years55
Weather and structures5483%7% 20 a day, more than 1 of the other 4 years8
Autumn6573%7% 23 a day, more than 3 of the other 4 years7
External8054%4% 29 a day, more than 3 of the other 4 years17
Network management2,77714%17% 99 a day, more than 2 of the other 4 years245
The operators' causes
Train faults3,53118%16% 126 a day, more than 2 of the other 4 years82
Traincrew3,49218%11% 125 a day, more than 3 of the other 4 years320
Stations7304%3% 26 a day, more than 2 of the other 4 years2
Operations4612%5% 16 a day, more than 2 of the other 4 years11
Operator, other8074%7% 29 a day, the least in 5 years5

Period by period

Delay minutes a day, period by period. Gridlines every 500 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,634
TGDriver2,618
IBPoints failure (including no fault found)1,192
J8OTM DAMAGE741
MDTechnical failures below the solebar678
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)646
MNBrake and brake systems faults; including wheel flats where no other cause had been identified619
TH(Senior) Conductor/Train Manager569
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards556
M8Technical failures above the Solebar447
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver95,836
TH(Senior) Conductor/Train Manager41,408
MDTechnical failures below the solebar37,697
IBPoints failure (including no fault found)35,699
M8Technical failures above the Solebar32,247
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.28,664
I1Overhead line/third rail defect24,882
J3Axle Counter Failure20,618
IRBroken/cracked/twisted/buckled/flawed rail20,536
ICTrack circuit failure (including no fault found)19,675