The biggest share (25%) of the delay picked up at Bishop Auckland West Station in the four weeks to 9 December 2023 came from signal, points and power faults.
93% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 105 | 25% | 16% | 4 a day, more than 1 of the other 4 years | - |
| Weather and structures | 57 | 13% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 10 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 53 | 12% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 75 | 18% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 51 | 12% | 11% | 2 a day, more than 1 of the other 4 years | 3 |
| Stations | 31 | 7% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 42 | 10% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 1 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J0 | Telecom equipment radio failure (GSM-R) | 61 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 53 |
| MC | Diesel Loco failure, defect, attention | 50 |
| TH | (Senior) Conductor/Train Manager | 33 |
| I5 | Possession over-run from planned work | 30 |
| IB | Points failure (including no fault found) | 28 |
| RB | Passengers joining/alighting | 26 |
| OU | Delays not Investigated by Network Rail | 20 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 18 |
| TG | Driver | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,129 |
| MD | Technical failures below the solebar | 1,690 |
| IC | Track circuit failure (including no fault found) | 1,528 |
| IB | Points failure (including no fault found) | 1,335 |
| RB | Passengers joining/alighting | 1,190 |
| M8 | Technical failures above the Solebar | 1,080 |
| XR | Cable vandalism or theft | 982 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 958 |
| M7 | Door and Door system faults | 950 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 946 |