Leaves on the Line

Billericay

BIC Anglia route
CSV JSON

0 delay minutes

No delay was picked up at Billericay in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.44
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)17
MDTechnical failures below the solebar8
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards8
RMWaiting connections from other transport modes6
QHAdhesion problems due to leaf contamination6
TGDriver6
IQTrackside sign blown down, fallen over, missing, defective, mis-placed6
IASignal failure (including no fault found)5
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)4