Leaves on the Line

Bidston

BID North West route
CSV JSON

2,619 delay minutes

The biggest share (32%) of the delay picked up at Bidston in the four weeks to 9 December 2023 came from other operator causes.

76% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power1104%16% 4 a day, more than 1 of the other 4 years1
Weather and structures612%7% 2 a day, more than 3 of the other 4 years1
Autumn75229%7% 27 a day, the most in 5 years5
External1656%4% 6 a day, the most in 5 years2
Network management723%17% 3 a day, the least in 5 years41
The operators' causes
Train faults1275%16% 5 a day, the most in 5 years10
Traincrew1024%11% 4 a day, more than 2 of the other 4 years1
Stations2239%3% 8 a day, more than 3 of the other 4 years-
Operations1606%5% 6 a day, more than 3 of the other 4 years-
Operator, other84932%7% 30 a day, the most in 5 years3

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TTLeaf fall Neutral847
Q3NZ Pumps T709
T2Delay at unstaffed station to non-DOO train223
XPBRIDGE HIT146
TZOther Passenger Train Operating Company causes106
IHPower Supply And Distribution System Failure84
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)44
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]43
TATrain-crew/loco/stock/unit diagram issues43
TH(Senior) Conductor/Train Manager42
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train7,727
TH(Senior) Conductor/Train Manager3,947
TGDriver3,187
MDTechnical failures below the solebar2,634
TTLeaf fall Neutral2,350
Q3NZ Pumps T2,086
OUDelays not Investigated by Network Rail2,076
TZOther Passenger Train Operating Company causes1,749
XPBRIDGE HIT1,489
M8Technical failures above the Solebar1,342