Barrow-in-Furness
2,348 delay minutes
The biggest share (34%) of the delay picked up at Barrow-in-Furness in the four weeks to 9 December 2023 came from weather and structures.
33% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 13 | <1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 238 | 10% | 16% | 9 a day, more than 3 of the other 4 years | 4 |
| Weather and structures | 798 | 34% | 7% | 29 a day, the most in 5 years | 15 |
| Autumn | 43 | 2% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 30 | 1% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 409 | 17% | 17% | 15 a day, the most in 5 years | 60 |
| The operators' causes | |||||
| Train faults | 200 | 8% | 16% | 7 a day, the least in 5 years | 1 |
| Traincrew | 374 | 16% | 11% | 13 a day, the most in 5 years | 73 |
| Stations | 23 | <1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 171 | 7% | 5% | 6 a day, more than 3 of the other 4 years | 3 |
| Operator, other | 51 | 2% | 7% | 2 a day, more than 3 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 547 |
| TG | Driver | 282 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 222 |
| IB | Points failure (including no fault found) | 125 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 106 |
| OU | Delays not Investigated by Network Rail | 100 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 85 |
| TH | (Senior) Conductor/Train Manager | 62 |
| TR | Train Operating Company Directive | 58 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 55 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 7,627 |
| MD | Technical failures below the solebar | 3,983 |
| TH | (Senior) Conductor/Train Manager | 2,372 |
| RB | Passengers joining/alighting | 1,587 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,578 |
| M7 | Door and Door system faults | 1,561 |
| M8 | Technical failures above the Solebar | 1,528 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,514 |
| IA | Signal failure (including no fault found) | 1,435 |
| IB | Points failure (including no fault found) | 1,251 |