Birkbeck
7 delay minutes
Most of the delay picked up at Birkbeck in the four weeks to 9 December 2023 came from traincrew problems.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 3 | 43% | 16% | 2 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | 2 |
| Traincrew | 4 | 57% | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 321 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 245 |
| IA | Signal failure (including no fault found) | 68 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 47 |
| VB | Vandalism or theft | 46 |
| IH | Power Supply And Distribution System Failure | 46 |
| OB | Delayed by signaller not applying applicable regulating policy | 46 |
| I5 | Possession over-run from planned work | 45 |
| RB | Passengers joining/alighting | 42 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 42 |