Leaves on the Line

Bingham

BIN East Midlands route
CSV JSON

1,588 delay minutes

Most of the delay picked up at Bingham in the four weeks to 9 December 2023 came from autumn leaves.

44% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track171%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power16811%16% 6 a day, more than 3 of the other 4 years-
Weather and structures453%7% 2 a day, the most in 5 years-
Autumn81851%7% 29 a day, the most in 5 years-
External13<1%4% 0 a day, more than 1 of the other 4 years-
Network management16610%17% 6 a day, more than 3 of the other 4 years-
The operators' causes
Train faults16510%16% 6 a day, more than 3 of the other 4 years-
Traincrew382%11% 1 a day, more than 1 of the other 4 years-
Stations403%3% 1 a day, more than 3 of the other 4 years-
Operations8<1%5% 0 a day, the least in 5 years-
Operator, other1117%7% 4 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation683
Q3NZ Pumps T102
MPRail / wheel interface, adhesion problems (including ice on the running rail)86
OUDelays not Investigated by Network Rail76
M8Technical failures above the Solebar51
MDTechnical failures below the solebar50
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure40
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail29
IISignalling lineside cable fault28
MNBrake and brake systems faults; including wheel flats where no other cause had been identified28
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar2,019
TGDriver1,851
M8Technical failures above the Solebar1,238
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,133
J3Axle Counter Failure1,031
Q1Takeback Pumps994
QJSpecial working for leaf-fall track circuit operation991
M7Door and Door system faults751
ICTrack circuit failure (including no fault found)722
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure705