Leaves on the Line

Bishops Stortford

BIS Anglia route
CSV JSON

1,600 delay minutes

The biggest share (40%) of the delay picked up at Bishops Stortford in the four weeks to 9 December 2023 came from how the network was run.

29% of these minutes were knock-on from something that happened elsewhere first. 49% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track46629%8% 17 a day, more than 3 of the other 4 years11
Signals, points and power533%16% 2 a day, the least in 5 years5
Weather and structures755%7% 3 a day, the most in 5 years-
Autumn252%7% 1 a day, more than 2 of the other 4 years-
External423%4% 2 a day, more than 2 of the other 4 years1
Network management64240%17% 23 a day, the most in 5 years8
The operators' causes
Train faults16710%16% 6 a day, more than 1 of the other 4 years1
Traincrew765%11% 3 a day, more than 2 of the other 4 years-
Stations8<1%3% 0 a day, the least in 5 years-
Operations2<1%5% 0 a day, the least in 5 years1
Operator, other443%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.458
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)456
MNBrake and brake systems faults; including wheel flats where no other cause had been identified72
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards71
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed70
TGDriver68
M8Technical failures above the Solebar36
VHPassenger Communication cord, door egress or emergency train alarm operated36
XPBRIDGE HIT36
M7Door and Door system faults29
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.13,417
IRBroken/cracked/twisted/buckled/flawed rail10,590
TGDriver3,375
MDTechnical failures below the solebar2,576
JSCondition of Track TSR outside the Timetable Planning Rules2,333
M8Technical failures above the Solebar2,092
IBPoints failure (including no fault found)1,797
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,792
M7Door and Door system faults1,724
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)1,660