Bishops Stortford
1,600 delay minutes
The biggest share (40%) of the delay picked up at Bishops Stortford in the four weeks to 9 December 2023 came from how the network was run.
29% of these minutes were knock-on from something that happened elsewhere first. 49% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 466 | 29% | 8% | 17 a day, more than 3 of the other 4 years | 11 |
| Signals, points and power | 53 | 3% | 16% | 2 a day, the least in 5 years | 5 |
| Weather and structures | 75 | 5% | 7% | 3 a day, the most in 5 years | - |
| Autumn | 25 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 42 | 3% | 4% | 2 a day, more than 2 of the other 4 years | 1 |
| Network management | 642 | 40% | 17% | 23 a day, the most in 5 years | 8 |
| The operators' causes | |||||
| Train faults | 167 | 10% | 16% | 6 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 76 | 5% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 8 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 2 | <1% | 5% | 0 a day, the least in 5 years | 1 |
| Operator, other | 44 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 458 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 456 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 72 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 71 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 70 |
| TG | Driver | 68 |
| M8 | Technical failures above the Solebar | 36 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 36 |
| XP | BRIDGE HIT | 36 |
| M7 | Door and Door system faults | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 13,417 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 10,590 |
| TG | Driver | 3,375 |
| MD | Technical failures below the solebar | 2,576 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 2,333 |
| M8 | Technical failures above the Solebar | 2,092 |
| IB | Points failure (including no fault found) | 1,797 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,792 |
| M7 | Door and Door system faults | 1,724 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 1,660 |