Leaves on the Line

Bicester Village

BIT Central route
CSV JSON

398 delay minutes

The biggest share (31%) of the delay picked up at Bicester Village in the four weeks to 9 December 2023 came from faulty trains.

72% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track113%8% 0 a day, the least in 5 years-
Signals, points and power8722%16% 3 a day, more than 2 of the other 4 years-
Weather and structures41%7% 0 a day, the least in 5 years-
Autumn359%7% 1 a day, the most in 5 years-
External41%4% 0 a day, the least in 5 years-
Network management5313%17% 2 a day, the least in 5 years-
The operators' causes
Train faults12331%16% 4 a day, more than 1 of the other 4 years1
Traincrew287%11% 1 a day, the least in 5 years-
Stations113%3% 0 a day, the least in 5 years-
Operations133%5% 0 a day, the least in 5 years-
Operator, other297%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)42
M7Door and Door system faults37
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure31
MDTechnical failures below the solebar20
MVEngineers on-track equipment failure outside possession20
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident20
QJSpecial working for leaf-fall track circuit operation17
TGDriver17
M8Technical failures above the Solebar15
Q3NZ Pumps T14
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)3,355
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)3,100
TGDriver3,011
MDTechnical failures below the solebar2,665
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,228
ICTrack circuit failure (including no fault found)1,983
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,905
RBPassengers joining/alighting1,561
J3Axle Counter Failure1,407
MCDiesel Loco failure, defect, attention1,107