Bicester Village
398 delay minutes
The biggest share (31%) of the delay picked up at Bicester Village in the four weeks to 9 December 2023 came from faulty trains.
72% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 11 | 3% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 87 | 22% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Weather and structures | 4 | 1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 35 | 9% | 7% | 1 a day, the most in 5 years | - |
| External | 4 | 1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 53 | 13% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 123 | 31% | 16% | 4 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 28 | 7% | 11% | 1 a day, the least in 5 years | - |
| Stations | 11 | 3% | 3% | 0 a day, the least in 5 years | - |
| Operations | 13 | 3% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 29 | 7% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 42 |
| M7 | Door and Door system faults | 37 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 31 |
| MD | Technical failures below the solebar | 20 |
| MV | Engineers on-track equipment failure outside possession | 20 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 20 |
| QJ | Special working for leaf-fall track circuit operation | 17 |
| TG | Driver | 17 |
| M8 | Technical failures above the Solebar | 15 |
| Q3 | NZ Pumps T | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 3,355 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3,100 |
| TG | Driver | 3,011 |
| MD | Technical failures below the solebar | 2,665 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,228 |
| IC | Track circuit failure (including no fault found) | 1,983 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,905 |
| RB | Passengers joining/alighting | 1,561 |
| J3 | Axle Counter Failure | 1,407 |
| MC | Diesel Loco failure, defect, attention | 1,107 |