Birkenhead Central
839 delay minutes
The biggest share (44%) of the delay picked up at Birkenhead Central in the four weeks to 9 December 2023 came from faulty trains.
46% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 14 | 2% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 26 | 3% | 7% | 1 a day, the most in 5 years | - |
| External | 50 | 6% | 4% | 2 a day, the most in 5 years | 2 |
| Network management | 100 | 12% | 17% | 4 a day, more than 2 of the other 4 years | 23 |
| The operators' causes | |||||
| Train faults | 365 | 44% | 16% | 13 a day, the most in 5 years | 6 |
| Traincrew | 189 | 23% | 11% | 7 a day, the most in 5 years | 1 |
| Stations | 16 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 69 | 8% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 11 | 1% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TH | (Senior) Conductor/Train Manager | 178 |
| M7 | Door and Door system faults | 133 |
| MD | Technical failures below the solebar | 98 |
| M8 | Technical failures above the Solebar | 67 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 66 |
| I9 | Fires starting on Network Rail Infrastructure | 41 |
| ZU | No Cause Identified After investigation by both Parties | 39 |
| MT | Confirmed train borne safety system faults (not cab based) | 19 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 18 |
| MU | Depot operating problem | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TH | (Senior) Conductor/Train Manager | 4,643 |
| ZU | No Cause Identified After investigation by both Parties | 2,146 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,080 |
| MD | Technical failures below the solebar | 1,565 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,451 |
| J3 | Axle Counter Failure | 1,245 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 940 |
| M7 | Door and Door system faults | 721 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 572 |
| IC | Track circuit failure (including no fault found) | 554 |