1,077 delay minutes

The biggest share (42%) of the delay picked up at Barking in the four weeks to 9 December 2023 came from track faults.

49% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track45542%8% 16 a day, more than 3 of the other 4 years7
Signals, points and power484%16% 2 a day, the least in 5 years1
Weather and structures--7% 0 a day, the least in 5 years-
Autumn6<1%7% 0 a day, the most in 5 years-
External1<1%4% 0 a day, the least in 5 years-
Network management18717%17% 7 a day, more than 3 of the other 4 years10
The operators' causes
Train faults14113%16% 5 a day, more than 2 of the other 4 years13
Traincrew12612%11% 5 a day, more than 3 of the other 4 years1
Stations9<1%3% 0 a day, the least in 5 years-
Operations192%5% 1 a day, the least in 5 years-
Operator, other868%7% 3 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.446
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)88
TGDriver85
VHPassenger Communication cord, door egress or emergency train alarm operated74
M8Technical failures above the Solebar44
MUDepot operating problem40
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]38
J0Telecom equipment radio failure (GSM-R)30
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)29
MDTechnical failures below the solebar27
Since 2018
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail7,631
TGDriver4,445
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,179
JATSR speed restrictions for track work outside of the Timetable Planning Rules3,790
JSCondition of Track TSR outside the Timetable Planning Rules2,866
I1Overhead line/third rail defect2,098
M8Technical failures above the Solebar1,871
XRCable vandalism or theft1,707
MDTechnical failures below the solebar1,681
MUDepot operating problem1,614