0 delay minutes

No delay was picked up at Blackheath in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%1
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified38
M8Technical failures above the Solebar18
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)16
OCSignaller including mis-routing (not ERTM /ETCS related)14
ICTrack circuit failure (including no fault found)11
QNVSTP Schedule/ VSTP Process (TSI created schedule)10
IBPoints failure (including no fault found)8
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)5
VHPassenger Communication cord, door egress or emergency train alarm operated4
MPRail / wheel interface, adhesion problems (including ice on the running rail)4