Bickley
17 delay minutes
Most of the delay picked up at Bickley in the four weeks to 9 December 2023 came from traincrew problems.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 3 | 18% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 14 | 82% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T3 | Waiting connections from other transport modes | 10 |
| TG | Driver | 4 |
| I5 | Possession over-run from planned work | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IH | Power Supply And Distribution System Failure | 27 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 16 |
| XP | BRIDGE HIT | 15 |
| TI | Traincrew rostering problem | 14 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 13 |
| IB | Points failure (including no fault found) | 11 |
| T3 | Waiting connections from other transport modes | 10 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 9 |
| TG | Driver | 4 |
| VB | Vandalism or theft | 3 |