Leaves on the Line

Birkenhead North

BKN North West route
CSV JSON

994 delay minutes

The biggest share (43%) of the delay picked up at Birkenhead North in the four weeks to 9 December 2023 came from faulty trains.

78% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power576%16% 2 a day, more than 2 of the other 4 years-
Weather and structures475%7% 2 a day, more than 3 of the other 4 years1
Autumn859%7% 3 a day, the most in 5 years-
External3<1%4% 0 a day, the least in 5 years2
Network management10410%17% 4 a day, more than 1 of the other 4 years2
The operators' causes
Train faults42543%16% 15 a day, the most in 5 years6
Traincrew13814%11% 5 a day, the most in 5 years2
Stations253%3% 1 a day, more than 2 of the other 4 years-
Operations626%5% 2 a day, the most in 5 years-
Operator, other465%7% 2 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M7Door and Door system faults198
TH(Senior) Conductor/Train Manager115
MDTechnical failures below the solebar105
M8Technical failures above the Solebar81
Q3NZ Pumps T77
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)51
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail47
ZUNo Cause Identified After investigation by both Parties44
TTLeaf fall Neutral44
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)32
Since 2018
CodeWhat Network Rail loggedMinutes
TH(Senior) Conductor/Train Manager4,610
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,580
ZUNo Cause Identified After investigation by both Parties2,620
J3Axle Counter Failure2,339
MDTechnical failures below the solebar2,050
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,696
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)1,380
M7Door and Door system faults1,066
TGDriver709
I9Fires starting on Network Rail Infrastructure648