Leaves on the Line

Birkenhead Hamilton Square

BKQ North West route
CSV JSON

26 delay minutes

Most of the delay picked up at Birkenhead Hamilton Square in the four weeks to 9 December 2023 came from faulty trains.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%1
Network management--17%5
The operators' causes
Train faults1973%16%4
Traincrew--11%1
Stations--3%-
Operations727%5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MUDepot operating problem19
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)7
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar46
MUDepot operating problem40
TGDriver16
XBVandalism or theft (including the placing of objects on the line)16
MNBrake and brake systems faults; including wheel flats where no other cause had been identified15
M8Technical failures above the Solebar15
TH(Senior) Conductor/Train Manager13
M7Door and Door system faults11
IESignalling Functional Power Supply Failure10
I5Possession over-run from planned work8