CSV JSON

4,054 delay minutes

The biggest share (23%) of the delay picked up at Bletchley in the four weeks to 9 December 2023 came from how the network was run.

73% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track752%8% 3 a day, the least in 5 years-
Signals, points and power78019%16% 28 a day, the most in 5 years9
Weather and structures531%7% 2 a day, more than 2 of the other 4 years-
Autumn571%7% 2 a day, more than 3 of the other 4 years-
External16<1%4% 1 a day, the least in 5 years-
Network management93123%17% 33 a day, the most in 5 years22
The operators' causes
Train faults82120%16% 29 a day, the most in 5 years6
Traincrew76119%11% 27 a day, the most in 5 years8
Stations1975%3% 7 a day, the most in 5 years-
Operations1243%5% 4 a day, the most in 5 years7
Operator, other2406%7% 9 a day, the most in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver595
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards385
IHPower Supply And Distribution System Failure290
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)206
MDTechnical failures below the solebar189
RYMishap - Station Operating causes146
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)135
VHPassenger Communication cord, door egress or emergency train alarm operated134
IISignalling lineside cable fault133
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure130
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver15,598
IRBroken/cracked/twisted/buckled/flawed rail7,717
IBPoints failure (including no fault found)7,312
TH(Senior) Conductor/Train Manager6,121
J3Axle Counter Failure5,807
MDTechnical failures below the solebar5,709
M8Technical failures above the Solebar5,655
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,439
JSCondition of Track TSR outside the Timetable Planning Rules3,882
I1Overhead line/third rail defect3,619