Bletchley
4,054 delay minutes
The biggest share (23%) of the delay picked up at Bletchley in the four weeks to 9 December 2023 came from how the network was run.
73% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 75 | 2% | 8% | 3 a day, the least in 5 years | - |
| Signals, points and power | 780 | 19% | 16% | 28 a day, the most in 5 years | 9 |
| Weather and structures | 53 | 1% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 57 | 1% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 16 | <1% | 4% | 1 a day, the least in 5 years | - |
| Network management | 931 | 23% | 17% | 33 a day, the most in 5 years | 22 |
| The operators' causes | |||||
| Train faults | 821 | 20% | 16% | 29 a day, the most in 5 years | 6 |
| Traincrew | 761 | 19% | 11% | 27 a day, the most in 5 years | 8 |
| Stations | 197 | 5% | 3% | 7 a day, the most in 5 years | - |
| Operations | 124 | 3% | 5% | 4 a day, the most in 5 years | 7 |
| Operator, other | 240 | 6% | 7% | 9 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 595 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 385 |
| IH | Power Supply And Distribution System Failure | 290 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 206 |
| MD | Technical failures below the solebar | 189 |
| RY | Mishap - Station Operating causes | 146 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 135 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 134 |
| II | Signalling lineside cable fault | 133 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 130 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 15,598 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 7,717 |
| IB | Points failure (including no fault found) | 7,312 |
| TH | (Senior) Conductor/Train Manager | 6,121 |
| J3 | Axle Counter Failure | 5,807 |
| MD | Technical failures below the solebar | 5,709 |
| M8 | Technical failures above the Solebar | 5,655 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,439 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,882 |
| I1 | Overhead line/third rail defect | 3,619 |