982 delay minutes

The biggest share (26%) of the delay picked up at Brimsdown in the four weeks to 9 December 2023 came from signal, points and power faults.

69% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track13514%8% 5 a day, more than 1 of the other 4 years-
Signals, points and power25626%16% 9 a day, more than 3 of the other 4 years-
Weather and structures7<1%7% 0 a day, more than 2 of the other 4 years-
Autumn182%7% 1 a day, more than 1 of the other 4 years-
External11512%4% 4 a day, more than 2 of the other 4 years-
Network management12813%17% 5 a day, the least in 5 years-
The operators' causes
Train faults909%16% 3 a day, the least in 5 years-
Traincrew232%11% 1 a day, the least in 5 years-
Stations182%3% 1 a day, the least in 5 years-
Operations9<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other18419%7% 7 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I2AC/DC trip (including no fault or cause found)248
VHPassenger Communication cord, door egress or emergency train alarm operated142
XPBRIDGE HIT107
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.98
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards40
IRBroken/cracked/twisted/buckled/flawed rail36
VZOther passenger or external causes the responsibility of TOC36
M8Technical failures above the Solebar31
M7Door and Door system faults25
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)20
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.13,622
RBPassengers joining/alighting6,426
MDTechnical failures below the solebar5,614
TGDriver4,806
M8Technical failures above the Solebar4,257
M7Door and Door system faults4,247
IRBroken/cracked/twisted/buckled/flawed rail4,060
IBPoints failure (including no fault found)3,810
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,980