Bromley North
34 delay minutes
The biggest share (29%) of the delay picked up at Bromley North in the four weeks to 9 December 2023 came from problems at stations.
65% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 4 | 12% | 7% | - |
| External | - | - | 4% | - |
| Network management | 5 | 15% | 17% | - |
| The operators' causes | ||||
| Train faults | 8 | 24% | 16% | 5 |
| Traincrew | 3 | 9% | 11% | - |
| Stations | 10 | 29% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 4 | 12% | 7% | 1 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RB | Passengers joining/alighting | 10 |
| M9 | Reported fleet equipment defect - no fault found | 8 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 4 |
| Q3 | NZ Pumps T | 4 |
| TG | Driver | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 1,502 |
| TG | Driver | 185 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 180 |
| J0 | Telecom equipment radio failure (GSM-R) | 171 |
| MD | Technical failures below the solebar | 151 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 133 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 128 |
| M9 | Reported fleet equipment defect - no fault found | 128 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 128 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 115 |