Bromley South
672 delay minutes
The biggest share (22%) of the delay picked up at Bromley South in the four weeks to 9 December 2023 came from how the network was run.
68% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 21 | 3% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 75 | 11% | 16% | 3 a day, more than 1 of the other 4 years | 2 |
| Weather and structures | 31 | 5% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 65 | 10% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 5 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 150 | 22% | 17% | 5 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 135 | 20% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Traincrew | 58 | 9% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 21 | 3% | 3% | 1 a day, the most in 5 years | - |
| Operations | 15 | 2% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 97 | 14% | 7% | 3 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M0 | Confirmed train cab based safety system fault (including GSMR) | 84 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 69 |
| IB | Points failure (including no fault found) | 54 |
| Q3 | NZ Pumps T | 50 |
| TT | Leaf fall Neutral | 48 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 47 |
| TG | Driver | 46 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 37 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 34 |
| OG | Ice on conductor rail/OHLE | 31 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 6,429 |
| TG | Driver | 2,103 |
| IB | Points failure (including no fault found) | 1,783 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,686 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,161 |
| XP | BRIDGE HIT | 1,121 |
| IC | Track circuit failure (including no fault found) | 1,109 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,032 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 954 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 919 |