Leaves on the Line

Bromley South

BMS Kent route
CSV JSON

672 delay minutes

The biggest share (22%) of the delay picked up at Bromley South in the four weeks to 9 December 2023 came from how the network was run.

68% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track213%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power7511%16% 3 a day, more than 1 of the other 4 years2
Weather and structures315%7% 1 a day, the most in 5 years-
Autumn6510%7% 2 a day, more than 2 of the other 4 years-
External5<1%4% 0 a day, the least in 5 years-
Network management15022%17% 5 a day, the least in 5 years-
The operators' causes
Train faults13520%16% 5 a day, more than 3 of the other 4 years-
Traincrew589%11% 2 a day, more than 2 of the other 4 years-
Stations213%3% 1 a day, the most in 5 years-
Operations152%5% 1 a day, more than 3 of the other 4 years-
Operator, other9714%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M0Confirmed train cab based safety system fault (including GSMR)84
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)69
IBPoints failure (including no fault found)54
Q3NZ Pumps T50
TTLeaf fall Neutral48
VHPassenger Communication cord, door egress or emergency train alarm operated47
TGDriver46
MNBrake and brake systems faults; including wheel flats where no other cause had been identified37
I6Delays as a result of line blocks / track patrols (including late handback)34
OGIce on conductor rail/OHLE31
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,429
TGDriver2,103
IBPoints failure (including no fault found)1,783
VHPassenger Communication cord, door egress or emergency train alarm operated1,686
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,161
XPBRIDGE HIT1,121
ICTrack circuit failure (including no fault found)1,109
OCSignaller including mis-routing (not ERTM /ETCS related)1,032
IRBroken/cracked/twisted/buckled/flawed rail954
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.919