1,755 delay minutes

The biggest share (27%) of the delay picked up at Bromsgrove in the four weeks to 9 December 2023 came from signal, points and power faults.

89% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track704%8% 3 a day, more than 1 of the other 4 years-
Signals, points and power47327%16% 17 a day, the most in 5 years-
Weather and structures1287%7% 5 a day, more than 2 of the other 4 years-
Autumn1026%7% 4 a day, the most in 5 years-
External231%4% 1 a day, more than 1 of the other 4 years2
Network management24814%17% 9 a day, more than 2 of the other 4 years-
The operators' causes
Train faults24514%16% 9 a day, more than 2 of the other 4 years1
Traincrew1478%11% 5 a day, more than 2 of the other 4 years-
Stations1569%3% 6 a day, the most in 5 years-
Operations443%5% 2 a day, more than 3 of the other 4 years-
Operator, other1207%7% 4 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure228
IBPoints failure (including no fault found)99
JKFlooding not due to exceptional weather97
TGDriver93
MNBrake and brake systems faults; including wheel flats where no other cause had been identified84
ICTrack circuit failure (including no fault found)73
MDTechnical failures below the solebar69
RQUn-booked assistance for a person with reduced mobility joining/alighting,67
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.59
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards52
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,236
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,455
J3Axle Counter Failure2,772
MDTechnical failures below the solebar2,613
TH(Senior) Conductor/Train Manager2,322
IBPoints failure (including no fault found)2,011
ZUNo Cause Identified After investigation by both Parties1,757
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,631
IRBroken/cracked/twisted/buckled/flawed rail1,620
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,443