Bramley (Hants)

BMY Wessex route
CSV JSON

1,429 delay minutes

The biggest share (20%) of the delay picked up at Bramley (Hants) in the four weeks to 9 December 2023 came from how the network was run.

78% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track18013%8% 6 a day, the most in 5 years-
Signals, points and power25418%16% 9 a day, the most in 5 years-
Weather and structures473%7% 2 a day, more than 3 of the other 4 years-
Autumn836%7% 3 a day, the most in 5 years-
External493%4% 2 a day, more than 3 of the other 4 years-
Network management28720%17% 10 a day, the most in 5 years-
The operators' causes
Train faults26719%16% 10 a day, the most in 5 years-
Traincrew957%11% 3 a day, more than 3 of the other 4 years-
Stations413%3% 1 a day, the most in 5 years-
Operations534%5% 2 a day, the most in 5 years-
Operator, other745%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MCDiesel Loco failure, defect, attention137
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.112
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure91
OCSignaller including mis-routing (not ERTM /ETCS related)86
IBPoints failure (including no fault found)84
TGDriver70
MDTechnical failures below the solebar60
IRBroken/cracked/twisted/buckled/flawed rail55
OUDelays not Investigated by Network Rail48
Q3NZ Pumps T41
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.7,485
IBPoints failure (including no fault found)2,748
JBReactionary Delay to 'P' coded TSRs2,306
MCDiesel Loco failure, defect, attention1,385
MDTechnical failures below the solebar1,279
TGDriver1,252
OCSignaller including mis-routing (not ERTM /ETCS related)1,224
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,171
IRBroken/cracked/twisted/buckled/flawed rail1,153
ICTrack circuit failure (including no fault found)1,134