Bramley (Hants)
1,429 delay minutes
The biggest share (20%) of the delay picked up at Bramley (Hants) in the four weeks to 9 December 2023 came from how the network was run.
78% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 180 | 13% | 8% | 6 a day, the most in 5 years | - |
| Signals, points and power | 254 | 18% | 16% | 9 a day, the most in 5 years | - |
| Weather and structures | 47 | 3% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 83 | 6% | 7% | 3 a day, the most in 5 years | - |
| External | 49 | 3% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 287 | 20% | 17% | 10 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 267 | 19% | 16% | 10 a day, the most in 5 years | - |
| Traincrew | 95 | 7% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 41 | 3% | 3% | 1 a day, the most in 5 years | - |
| Operations | 53 | 4% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 74 | 5% | 7% | 3 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MC | Diesel Loco failure, defect, attention | 137 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 112 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 91 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 86 |
| IB | Points failure (including no fault found) | 84 |
| TG | Driver | 70 |
| MD | Technical failures below the solebar | 60 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 55 |
| OU | Delays not Investigated by Network Rail | 48 |
| Q3 | NZ Pumps T | 41 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,485 |
| IB | Points failure (including no fault found) | 2,748 |
| JB | Reactionary Delay to 'P' coded TSRs | 2,306 |
| MC | Diesel Loco failure, defect, attention | 1,385 |
| MD | Technical failures below the solebar | 1,279 |
| TG | Driver | 1,252 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,224 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,171 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,153 |
| IC | Track circuit failure (including no fault found) | 1,134 |