Bourne End
664 delay minutes
The biggest share (33%) of the delay picked up at Bourne End in the four weeks to 9 December 2023 came from how the network was run.
77% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 187 | 28% | 8% | 7 a day, the most in 5 years | - |
| Signals, points and power | 66 | 10% | 16% | 2 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 11 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 5 | <1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 220 | 33% | 17% | 8 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 74 | 11% | 16% | 3 a day, more than 2 of the other 4 years | 9 |
| Traincrew | 86 | 13% | 11% | 3 a day, the most in 5 years | 1 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 5 | <1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 11 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 169 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 108 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 76 |
| TG | Driver | 73 |
| MD | Technical failures below the solebar | 42 |
| I1 | Overhead line/third rail defect | 26 |
| M7 | Door and Door system faults | 23 |
| IB | Points failure (including no fault found) | 20 |
| ZU | No Cause Identified After investigation by both Parties | 20 |
| J0 | Telecom equipment radio failure (GSM-R) | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IL | Token equipment failure (including no fault found) | 1,915 |
| ZU | No Cause Identified After investigation by both Parties | 1,884 |
| IB | Points failure (including no fault found) | 1,863 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 1,411 |
| TG | Driver | 1,288 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,050 |
| MD | Technical failures below the solebar | 918 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 916 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 860 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 667 |