Barnehurst
790 delay minutes
The biggest share (31%) of the delay picked up at Barnehurst in the four weeks to 9 December 2023 came from faulty trains.
77% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 29 | 4% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 39 | 5% | 16% | 1 a day, more than 1 of the other 4 years | 3 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 91 | 11% | 7% | 3 a day, more than 1 of the other 4 years | - |
| External | 4 | <1% | 4% | 0 a day, the least in 5 years | 1 |
| Network management | 153 | 19% | 17% | 5 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 246 | 31% | 16% | 9 a day, more than 2 of the other 4 years | - |
| Traincrew | 48 | 6% | 11% | 2 a day, the least in 5 years | - |
| Stations | 23 | 3% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 23 | 3% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 135 | 17% | 7% | 5 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 91 |
| Q3 | NZ Pumps T | 91 |
| M8 | Technical failures above the Solebar | 84 |
| TT | Leaf fall Neutral | 79 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 68 |
| TG | Driver | 45 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 40 |
| M7 | Door and Door system faults | 33 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 19 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 6,869 |
| TG | Driver | 3,359 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 3,004 |
| IC | Track circuit failure (including no fault found) | 2,781 |
| IB | Points failure (including no fault found) | 2,197 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,863 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,815 |
| TT | Leaf fall Neutral | 1,533 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,441 |
| M7 | Door and Door system faults | 1,279 |