Leaves on the Line

Barnes

BNS Wessex route
CSV JSON

792 delay minutes

The biggest share (39%) of the delay picked up at Barnes in the four weeks to 9 December 2023 came from how the network was run.

62% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track122%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power628%16% 2 a day, more than 1 of the other 4 years-
Weather and structures3<1%7% 0 a day, the least in 5 years-
Autumn668%7% 2 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management30839%17% 11 a day, more than 1 of the other 4 years-
The operators' causes
Train faults516%16% 2 a day, the least in 5 years-
Traincrew9913%11% 4 a day, more than 1 of the other 4 years-
Stations8811%3% 3 a day, more than 2 of the other 4 years-
Operations223%5% 1 a day, more than 3 of the other 4 years-
Operator, other8110%7% 3 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)115
T2Delay at unstaffed station to non-DOO train78
I6Delays as a result of line blocks / track patrols (including late handback)71
OCSignaller including mis-routing (not ERTM /ETCS related)70
TGDriver66
Q3NZ Pumps T43
TTLeaf fall Neutral43
VHPassenger Communication cord, door egress or emergency train alarm operated24
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed23
ICTrack circuit failure (including no fault found)21
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,506
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)4,056
I1Overhead line/third rail defect3,122
TGDriver3,063
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,746
ICTrack circuit failure (including no fault found)2,623
I6Delays as a result of line blocks / track patrols (including late handback)2,464
OCSignaller including mis-routing (not ERTM /ETCS related)2,264
VHPassenger Communication cord, door egress or emergency train alarm operated2,225
T2Delay at unstaffed station to non-DOO train2,076