Barnsley
1,555 delay minutes
The biggest share (26%) of the delay picked up at Barnsley in the four weeks to 9 December 2023 came from autumn leaves.
47% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 44 | 3% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 59 | 4% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 118 | 8% | 7% | 4 a day, the most in 5 years | - |
| Autumn | 412 | 26% | 7% | 15 a day, more than 2 of the other 4 years | - |
| External | 43 | 3% | 4% | 2 a day, more than 2 of the other 4 years | - |
| Network management | 207 | 13% | 17% | 7 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 152 | 10% | 16% | 5 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 92 | 6% | 11% | 3 a day, more than 2 of the other 4 years | 5 |
| Stations | 63 | 4% | 3% | 2 a day, the least in 5 years | - |
| Operations | 58 | 4% | 5% | 2 a day, more than 2 of the other 4 years | - |
| Operator, other | 309 | 20% | 7% | 11 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 300 |
| TT | Leaf fall Neutral | 293 |
| MD | Technical failures below the solebar | 111 |
| QJ | Special working for leaf-fall track circuit operation | 109 |
| OU | Delays not Investigated by Network Rail | 105 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 61 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 53 |
| TI | Traincrew rostering problem | 37 |
| OL | Signal Box not open during booked hours | 36 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 33 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 6,224 |
| MD | Technical failures below the solebar | 4,444 |
| TG | Driver | 3,222 |
| Q3 | NZ Pumps T | 3,149 |
| TT | Leaf fall Neutral | 2,546 |
| RB | Passengers joining/alighting | 2,336 |
| IC | Track circuit failure (including no fault found) | 2,178 |
| IB | Points failure (including no fault found) | 2,020 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,772 |
| XP | BRIDGE HIT | 1,771 |