790 delay minutes
The biggest share (34%) of the delay picked up at Botley in the four weeks to 9 December 2023 came from track faults.
47% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 268 | 34% | 8% | 10 a day, the most in 5 years | - |
| Signals, points and power | 153 | 19% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Weather and structures | 15 | 2% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 49 | 6% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 159 | 20% | 17% | 6 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 41 | 5% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 25 | 3% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 35 | 4% | 3% | 1 a day, the most in 5 years | - |
| Operations | 13 | 2% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 32 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 259 |
| I1 | Overhead line/third rail defect | 68 |
| IB | Points failure (including no fault found) | 38 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 30 |
| I4 | OHLE/third rail power supply failure or reduction | 27 |
| QI | Cautioning due to railhead leaf contamination | 25 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 23 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 22 |
| II | Signalling lineside cable fault | 20 |
| QN | VSTP Schedule/ VSTP Process (TSI created schedule) | 19 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,084 |
| IC | Track circuit failure (including no fault found) | 1,178 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,116 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 745 |
| TG | Driver | 737 |
| II | Signalling lineside cable fault | 730 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 705 |
| I4 | OHLE/third rail power supply failure or reduction | 685 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 587 |
| MD | Technical failures below the solebar | 574 |