Leaves on the Line

Botley

BOE Wessex route
CSV JSON

790 delay minutes

The biggest share (34%) of the delay picked up at Botley in the four weeks to 9 December 2023 came from track faults.

47% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track26834%8% 10 a day, the most in 5 years-
Signals, points and power15319%16% 5 a day, more than 3 of the other 4 years-
Weather and structures152%7% 1 a day, more than 3 of the other 4 years-
Autumn496%7% 2 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management15920%17% 6 a day, the most in 5 years-
The operators' causes
Train faults415%16% 1 a day, the least in 5 years-
Traincrew253%11% 1 a day, more than 1 of the other 4 years-
Stations354%3% 1 a day, the most in 5 years-
Operations132%5% 0 a day, more than 3 of the other 4 years-
Operator, other324%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.259
I1Overhead line/third rail defect68
IBPoints failure (including no fault found)38
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards30
I4OHLE/third rail power supply failure or reduction27
QICautioning due to railhead leaf contamination25
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)23
OCSignaller including mis-routing (not ERTM /ETCS related)22
IISignalling lineside cable fault20
QNVSTP Schedule/ VSTP Process (TSI created schedule)19
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,084
ICTrack circuit failure (including no fault found)1,178
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,116
JHCritical Rail Temperature speeds, (other than buckled rails)745
TGDriver737
IISignalling lineside cable fault730
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail705
I4OHLE/third rail power supply failure or reduction685
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure587
MDTechnical failures below the solebar574