Bolton
3,388 delay minutes
The biggest share (18%) of the delay picked up at Bolton in the four weeks to 9 December 2023 came from faulty trains.
80% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 44 | 1% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 381 | 11% | 16% | 14 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 118 | 3% | 7% | 4 a day, more than 3 of the other 4 years | 1 |
| Autumn | 584 | 17% | 7% | 21 a day, the most in 5 years | - |
| External | 276 | 8% | 4% | 10 a day, the most in 5 years | 1 |
| Network management | 347 | 10% | 17% | 12 a day, more than 2 of the other 4 years | 5 |
| The operators' causes | |||||
| Train faults | 625 | 18% | 16% | 22 a day, more than 3 of the other 4 years | 5 |
| Traincrew | 295 | 9% | 11% | 11 a day, more than 2 of the other 4 years | 5 |
| Stations | 243 | 7% | 3% | 9 a day, the most in 5 years | - |
| Operations | 196 | 6% | 5% | 7 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 281 | 8% | 7% | 10 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 273 |
| IB | Points failure (including no fault found) | 207 |
| Q3 | NZ Pumps T | 203 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 177 |
| TT | Leaf fall Neutral | 175 |
| MD | Technical failures below the solebar | 170 |
| TG | Driver | 155 |
| M8 | Technical failures above the Solebar | 116 |
| TH | (Senior) Conductor/Train Manager | 90 |
| M7 | Door and Door system faults | 89 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 9,821 |
| TG | Driver | 9,764 |
| IC | Track circuit failure (including no fault found) | 3,693 |
| IB | Points failure (including no fault found) | 3,546 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,530 |
| M8 | Technical failures above the Solebar | 3,210 |
| M7 | Door and Door system faults | 3,143 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,822 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 2,532 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,472 |