1,987 delay minutes

The biggest share (22%) of the delay picked up at Blackpool North in the four weeks to 9 December 2023 came from faulty trains.

67% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track583%8% 2 a day, more than 3 of the other 4 years1
Signals, points and power25613%16% 9 a day, more than 3 of the other 4 years2
Weather and structures20810%7% 7 a day, the most in 5 years5
Autumn814%7% 3 a day, more than 1 of the other 4 years-
External342%4% 1 a day, more than 2 of the other 4 years-
Network management1759%17% 6 a day, the least in 5 years58
The operators' causes
Train faults44322%16% 16 a day, more than 3 of the other 4 years6
Traincrew35018%11% 13 a day, more than 1 of the other 4 years78
Stations362%3% 1 a day, more than 1 of the other 4 years-
Operations20110%5% 7 a day, the most in 5 years5
Operator, other1467%7% 5 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver227
TZOther Passenger Train Operating Company causes121
MDTechnical failures below the solebar107
TH(Senior) Conductor/Train Manager93
OUDelays not Investigated by Network Rail92
J0Telecom equipment radio failure (GSM-R)89
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps84
MTConfirmed train borne safety system faults (not cab based)75
ICTrack circuit failure (including no fault found)68
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)59
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver13,382
MDTechnical failures below the solebar5,784
M8Technical failures above the Solebar4,910
M7Door and Door system faults3,684
TH(Senior) Conductor/Train Manager3,648
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps3,166
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,582
TRTrain Operating Company Directive2,268
RBPassengers joining/alighting2,117
TZOther Passenger Train Operating Company causes2,098