Blackpool South
656 delay minutes
The biggest share (20%) of the delay picked up at Blackpool South in the four weeks to 9 December 2023 came from other operator causes.
72% of these minutes were knock-on from something that happened elsewhere first. 74% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 65 | 10% | 16% | 2 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 25 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 88 | 13% | 7% | 3 a day, the least in 5 years | - |
| External | 43 | 7% | 4% | 2 a day, more than 3 of the other 4 years | 2 |
| Network management | 80 | 12% | 17% | 3 a day, more than 2 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 85 | 13% | 16% | 3 a day, more than 2 of the other 4 years | 7 |
| Traincrew | 88 | 13% | 11% | 3 a day, more than 1 of the other 4 years | 15 |
| Stations | 13 | 2% | 3% | 0 a day, the least in 5 years | - |
| Operations | 41 | 6% | 5% | 1 a day, more than 1 of the other 4 years | 3 |
| Operator, other | 129 | 20% | 7% | 5 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 80 |
| TT | Leaf fall Neutral | 80 |
| OU | Delays not Investigated by Network Rail | 75 |
| VE | Ticket irregularities or refusals to pay | 49 |
| TG | Driver | 45 |
| TH | (Senior) Conductor/Train Manager | 43 |
| J0 | Telecom equipment radio failure (GSM-R) | 32 |
| M8 | Technical failures above the Solebar | 26 |
| MD | Technical failures below the solebar | 25 |
| IB | Points failure (including no fault found) | 21 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RB | Passengers joining/alighting | 8,795 |
| TG | Driver | 4,465 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 3,824 |
| Q3 | NZ Pumps T | 3,578 |
| MD | Technical failures below the solebar | 3,476 |
| TT | Leaf fall Neutral | 2,994 |
| TZ | Other Passenger Train Operating Company causes | 1,786 |
| TH | (Senior) Conductor/Train Manager | 1,459 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,415 |
| M7 | Door and Door system faults | 1,397 |