Leaves on the Line

Blackpool South

BPS North West route
CSV JSON

656 delay minutes

The biggest share (20%) of the delay picked up at Blackpool South in the four weeks to 9 December 2023 came from other operator causes.

72% of these minutes were knock-on from something that happened elsewhere first. 74% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power6510%16% 2 a day, more than 1 of the other 4 years1
Weather and structures254%7% 1 a day, more than 2 of the other 4 years-
Autumn8813%7% 3 a day, the least in 5 years-
External437%4% 2 a day, more than 3 of the other 4 years2
Network management8012%17% 3 a day, more than 2 of the other 4 years4
The operators' causes
Train faults8513%16% 3 a day, more than 2 of the other 4 years7
Traincrew8813%11% 3 a day, more than 1 of the other 4 years15
Stations132%3% 0 a day, the least in 5 years-
Operations416%5% 1 a day, more than 1 of the other 4 years3
Operator, other12920%7% 5 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T80
TTLeaf fall Neutral80
OUDelays not Investigated by Network Rail75
VETicket irregularities or refusals to pay49
TGDriver45
TH(Senior) Conductor/Train Manager43
J0Telecom equipment radio failure (GSM-R)32
M8Technical failures above the Solebar26
MDTechnical failures below the solebar25
IBPoints failure (including no fault found)21
Since 2018
CodeWhat Network Rail loggedMinutes
RBPassengers joining/alighting8,795
TGDriver4,465
RCre-booked assistance for a person with reduced mobility joining/alighting,3,824
Q3NZ Pumps T3,578
MDTechnical failures below the solebar3,476
TTLeaf fall Neutral2,994
TZOther Passenger Train Operating Company causes1,786
TH(Senior) Conductor/Train Manager1,459
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,415
M7Door and Door system faults1,397