Bristol Parkway
2,196 delay minutes
The biggest share (31%) of the delay picked up at Bristol Parkway in the four weeks to 9 December 2023 came from weather and structures.
50% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 214 | 10% | 8% | 8 a day, the most in 5 years | 3 |
| Signals, points and power | 412 | 19% | 16% | 15 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 683 | 31% | 7% | 24 a day, the most in 5 years | - |
| Autumn | 14 | <1% | 7% | 1 a day, the least in 5 years | - |
| External | 23 | 1% | 4% | 1 a day, more than 1 of the other 4 years | 1 |
| Network management | 255 | 12% | 17% | 9 a day, more than 3 of the other 4 years | 6 |
| The operators' causes | |||||
| Train faults | 265 | 12% | 16% | 9 a day, more than 3 of the other 4 years | 9 |
| Traincrew | 197 | 9% | 11% | 7 a day, the most in 5 years | 6 |
| Stations | 74 | 3% | 3% | 3 a day, more than 3 of the other 4 years | - |
| Operations | 20 | <1% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 39 | 2% | 7% | 1 a day, more than 2 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 612 |
| IB | Points failure (including no fault found) | 260 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 165 |
| TG | Driver | 163 |
| OU | Delays not Investigated by Network Rail | 69 |
| JK | Flooding not due to exceptional weather | 63 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 50 |
| J0 | Telecom equipment radio failure (GSM-R) | 44 |
| MD | Technical failures below the solebar | 43 |
| MU | Depot operating problem | 43 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 7,765 |
| TG | Driver | 6,226 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 5,485 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,999 |
| MD | Technical failures below the solebar | 3,552 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,083 |
| M8 | Technical failures above the Solebar | 2,600 |
| J3 | Axle Counter Failure | 2,499 |
| M7 | Door and Door system faults | 2,299 |
| MU | Depot operating problem | 1,908 |