CSV JSON

2,196 delay minutes

The biggest share (31%) of the delay picked up at Bristol Parkway in the four weeks to 9 December 2023 came from weather and structures.

50% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track21410%8% 8 a day, the most in 5 years3
Signals, points and power41219%16% 15 a day, more than 3 of the other 4 years1
Weather and structures68331%7% 24 a day, the most in 5 years-
Autumn14<1%7% 1 a day, the least in 5 years-
External231%4% 1 a day, more than 1 of the other 4 years1
Network management25512%17% 9 a day, more than 3 of the other 4 years6
The operators' causes
Train faults26512%16% 9 a day, more than 3 of the other 4 years9
Traincrew1979%11% 7 a day, the most in 5 years6
Stations743%3% 3 a day, more than 3 of the other 4 years-
Operations20<1%5% 1 a day, more than 2 of the other 4 years-
Operator, other392%7% 1 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure612
IBPoints failure (including no fault found)260
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.165
TGDriver163
OUDelays not Investigated by Network Rail69
JKFlooding not due to exceptional weather63
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps50
J0Telecom equipment radio failure (GSM-R)44
MDTechnical failures below the solebar43
MUDepot operating problem43
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)7,765
TGDriver6,226
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure5,485
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,999
MDTechnical failures below the solebar3,552
OCSignaller including mis-routing (not ERTM /ETCS related)3,083
M8Technical failures above the Solebar2,600
J3Axle Counter Failure2,499
M7Door and Door system faults2,299
MUDepot operating problem1,908