Leaves on the Line

Brixton

BRX Kent route
CSV JSON

294 delay minutes

The biggest share (45%) of the delay picked up at Brixton in the four weeks to 9 December 2023 came from how the network was run.

48% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track41%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power3111%16% 1 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn134%7% 0 a day, more than 3 of the other 4 years-
External41%4% 0 a day, the least in 5 years-
Network management13245%17% 5 a day, the most in 5 years-
The operators' causes
Train faults3512%16% 1 a day, more than 1 of the other 4 years1
Traincrew62%11% 0 a day, the least in 5 years-
Stations62%3% 0 a day, more than 3 of the other 4 years-
Operations145%5% 1 a day, the most in 5 years-
Operator, other4917%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QBPlanned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules)55
VHPassenger Communication cord, door egress or emergency train alarm operated33
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)25
IBPoints failure (including no fault found)24
I6Delays as a result of line blocks / track patrols (including late handback)22
Q3NZ Pumps T13
OCSignaller including mis-routing (not ERTM /ETCS related)11
TTLeaf fall Neutral11
OBDelayed by signaller not applying applicable regulating policy10
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)10
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,318
ICTrack circuit failure (including no fault found)2,264
IBPoints failure (including no fault found)1,339
TGDriver1,145
VHPassenger Communication cord, door egress or emergency train alarm operated1,091
XPBRIDGE HIT897
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure833
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.740
OBDelayed by signaller not applying applicable regulating policy674
MNBrake and brake systems faults; including wheel flats where no other cause had been identified649