Bury St Edmunds
477 delay minutes
The biggest share (28%) of the delay picked up at Bury St Edmunds in the four weeks to 9 December 2023 came from how the network was run.
69% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 20 | 4% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 87 | 18% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Weather and structures | 6 | 1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 59 | 12% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 26 | 5% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 132 | 28% | 17% | 5 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 63 | 13% | 16% | 2 a day, the least in 5 years | 2 |
| Traincrew | 10 | 2% | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 25 | 5% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 50 | 10% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 64 |
| QJ | Special working for leaf-fall track circuit operation | 34 |
| M7 | Door and Door system faults | 28 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 26 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 23 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 19 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 17 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 16 |
| OM | Technical failure associated with a Railhead conditioning train | 15 |
| MC | Diesel Loco failure, defect, attention | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,825 |
| MD | Technical failures below the solebar | 2,089 |
| MC | Diesel Loco failure, defect, attention | 1,981 |
| IC | Track circuit failure (including no fault found) | 1,895 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,163 |
| M8 | Technical failures above the Solebar | 1,010 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 974 |
| IB | Points failure (including no fault found) | 914 |
| MU | Depot operating problem | 865 |
| QJ | Special working for leaf-fall track circuit operation | 753 |