Leaves on the Line

Bedford St Johns

BSJ West Coast South route
CSV JSON

0 delay minutes

No delay was picked up at Bedford St Johns in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver48
MDTechnical failures below the solebar29
XBVandalism or theft (including the placing of objects on the line)19
MNBrake and brake systems faults; including wheel flats where no other cause had been identified15
TH(Senior) Conductor/Train Manager14
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles6
IBPoints failure (including no fault found)5
VZOther passenger or external causes the responsibility of TOC3
QMTrain schedule/STP Process including erroneous simplifiers2
ZZUnexplained loss in running system Roll-up Only2