4,135 delay minutes

The biggest share (37%) of the delay picked up at Basingstoke in the four weeks to 9 December 2023 came from signal, points and power faults.

68% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1704%8% 6 a day, more than 2 of the other 4 years4
Signals, points and power1,52737%16% 55 a day, the most in 5 years33
Weather and structures3829%7% 14 a day, the most in 5 years26
Autumn3488%7% 12 a day, the most in 5 years-
External581%4% 2 a day, more than 1 of the other 4 years4
Network management50612%17% 18 a day, more than 1 of the other 4 years24
The operators' causes
Train faults2787%16% 10 a day, more than 1 of the other 4 years33
Traincrew3308%11% 12 a day, the most in 5 years34
Stations1313%3% 5 a day, the most in 5 years-
Operations1313%5% 5 a day, the most in 5 years5
Operator, other2757%7% 10 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)946
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)274
TGDriver213
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure191
IASignal failure (including no fault found)160
OCSignaller including mis-routing (not ERTM /ETCS related)141
Q3NZ Pumps T135
QHAdhesion problems due to leaf contamination134
TTLeaf fall Neutral132
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)96
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)7,611
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,425
TGDriver5,532
MDTechnical failures below the solebar5,165
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,607
ICTrack circuit failure (including no fault found)4,604
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)3,756
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive3,662
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,228
OCSignaller including mis-routing (not ERTM /ETCS related)3,084