Basingstoke
4,135 delay minutes
The biggest share (37%) of the delay picked up at Basingstoke in the four weeks to 9 December 2023 came from signal, points and power faults.
68% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 170 | 4% | 8% | 6 a day, more than 2 of the other 4 years | 4 |
| Signals, points and power | 1,527 | 37% | 16% | 55 a day, the most in 5 years | 33 |
| Weather and structures | 382 | 9% | 7% | 14 a day, the most in 5 years | 26 |
| Autumn | 348 | 8% | 7% | 12 a day, the most in 5 years | - |
| External | 58 | 1% | 4% | 2 a day, more than 1 of the other 4 years | 4 |
| Network management | 506 | 12% | 17% | 18 a day, more than 1 of the other 4 years | 24 |
| The operators' causes | |||||
| Train faults | 278 | 7% | 16% | 10 a day, more than 1 of the other 4 years | 33 |
| Traincrew | 330 | 8% | 11% | 12 a day, the most in 5 years | 34 |
| Stations | 131 | 3% | 3% | 5 a day, the most in 5 years | - |
| Operations | 131 | 3% | 5% | 5 a day, the most in 5 years | 5 |
| Operator, other | 275 | 7% | 7% | 10 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 946 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 274 |
| TG | Driver | 213 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 191 |
| IA | Signal failure (including no fault found) | 160 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 141 |
| Q3 | NZ Pumps T | 135 |
| QH | Adhesion problems due to leaf contamination | 134 |
| TT | Leaf fall Neutral | 132 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 96 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 7,611 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,425 |
| TG | Driver | 5,532 |
| MD | Technical failures below the solebar | 5,165 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,607 |
| IC | Track circuit failure (including no fault found) | 4,604 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 3,756 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 3,662 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3,228 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,084 |