Leaves on the Line

Branksome

BSM Wessex route
CSV JSON

602 delay minutes

The biggest share (30%) of the delay picked up at Branksome in the four weeks to 9 December 2023 came from faulty trains.

78% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track12421%8% 4 a day, the most in 5 years-
Signals, points and power8314%16% 3 a day, the most in 5 years-
Weather and structures163%7% 1 a day, more than 3 of the other 4 years-
Autumn183%7% 1 a day, more than 3 of the other 4 years-
External132%4% 0 a day, more than 1 of the other 4 years-
Network management10517%17% 4 a day, the most in 5 years-
The operators' causes
Train faults18130%16% 6 a day, the most in 5 years-
Traincrew91%11% 0 a day, the least in 5 years-
Stations3<1%3% 0 a day, the least in 5 years-
Operations366%5% 1 a day, the most in 5 years-
Operator, other142%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar161
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.118
I5Possession over-run from planned work39
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards36
TBTrain cancelled or delayed at Train Operators request36
IBPoints failure (including no fault found)31
J3Axle Counter Failure23
XBVandalism or theft (including the placing of objects on the line)13
IISignalling lineside cable fault12
MFEngineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners11
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,142
IBPoints failure (including no fault found)914
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure817
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)737
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.726
TGDriver689
ICTrack circuit failure (including no fault found)591
TH(Senior) Conductor/Train Manager560
MYCoupler, Coupler system and Jumper cable faults550
XBVandalism or theft (including the placing of objects on the line)544