Leaves on the Line

Boston

BSN East Midlands route
CSV JSON

709 delay minutes

The biggest share (30%) of the delay picked up at Boston in the four weeks to 9 December 2023 came from autumn leaves.

58% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power11316%16% 4 a day, more than 2 of the other 4 years-
Weather and structures132%7% 0 a day, the most in 5 years-
Autumn21630%7% 8 a day, the most in 5 years1
External172%4% 1 a day, more than 2 of the other 4 years-
Network management17625%17% 6 a day, more than 3 of the other 4 years4
The operators' causes
Train faults9714%16% 3 a day, more than 2 of the other 4 years4
Traincrew294%11% 1 a day, more than 2 of the other 4 years2
Stations91%3% 0 a day, the least in 5 years-
Operations203%5% 1 a day, more than 2 of the other 4 years-
Operator, other213%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation106
QHAdhesion problems due to leaf contamination93
M7Door and Door system faults75
IISignalling lineside cable fault48
OUDelays not Investigated by Network Rail37
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)31
IESignalling Functional Power Supply Failure24
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident24
M8Technical failures above the Solebar19
OLSignal Box not open during booked hours18
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,570
M8Technical failures above the Solebar1,568
TGDriver1,200
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,116
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles916
IISignalling lineside cable fault884
QAWTT schedule and or LTP Process including erroneous simplifiers851
IASignal failure (including no fault found)838
M7Door and Door system faults775
ICTrack circuit failure (including no fault found)686