Boston
709 delay minutes
The biggest share (30%) of the delay picked up at Boston in the four weeks to 9 December 2023 came from autumn leaves.
58% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 113 | 16% | 16% | 4 a day, more than 2 of the other 4 years | - |
| Weather and structures | 13 | 2% | 7% | 0 a day, the most in 5 years | - |
| Autumn | 216 | 30% | 7% | 8 a day, the most in 5 years | 1 |
| External | 17 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 176 | 25% | 17% | 6 a day, more than 3 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 97 | 14% | 16% | 3 a day, more than 2 of the other 4 years | 4 |
| Traincrew | 29 | 4% | 11% | 1 a day, more than 2 of the other 4 years | 2 |
| Stations | 9 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 20 | 3% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 21 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 106 |
| QH | Adhesion problems due to leaf contamination | 93 |
| M7 | Door and Door system faults | 75 |
| II | Signalling lineside cable fault | 48 |
| OU | Delays not Investigated by Network Rail | 37 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 31 |
| IE | Signalling Functional Power Supply Failure | 24 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 24 |
| M8 | Technical failures above the Solebar | 19 |
| OL | Signal Box not open during booked hours | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,570 |
| M8 | Technical failures above the Solebar | 1,568 |
| TG | Driver | 1,200 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,116 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 916 |
| II | Signalling lineside cable fault | 884 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 851 |
| IA | Signal failure (including no fault found) | 838 |
| M7 | Door and Door system faults | 775 |
| IC | Track circuit failure (including no fault found) | 686 |